Reducing Tee Pipe Fittng Mould

Original
price: Negotiable
minimum:
Total supply:
Delivery term: The date of payment from buyers deliver within days
seat: Beijing
Validity to: Long-term effective
Last update: 2017-08-25 03:48
Browse the number: 219
inquiry
Company Profile
 
 
Product details

Specifications of reducing Tee pipe fittng mould

 

Name

UPVC pipe fitting mould

Mould material

2316, S136

Mould base

LKM, HASCO, KAIJI   STANDARD

Cavity

Single/multi

Runner

Hot/cold

Design software

CAD, CAM, CAE

Plastic material

UPVC

Mould life

500, 000-1, 000, 000 shots

Delivery time

30-60 days

Packing

Wooden case

 

Mould quality control

For the Q/C of mold, there are 3 steps:

1.Mould Material Q/C

- Mould Steel Checking(Hardness, flaw detection)

- Mould Standard Spare Parts Checking(hardness, size, flaw checking)

2.Mould Making Process Q/C 

- design checking (part design, mould design, mould engineering drawing)

- Each part of mould’s size checking after machining according to 2D drawing

- mould testing(check mould running condition)

3.check with customer’s requirement again before mold shipping.

 

Mould  maintenance

a)When the mould is vacant, spray the anti-rust oil

b)To clean the gate and cooling system regularly

c)Avoid to use recycled material if the mould is suitable for virgin material only

 

After-Sale Service

a)Engineering and one interpreter can be sent to customer’s factory for first running.

b)one-year after-sale technique support

 

Total0bar [View All]  Related Comments
 
more»Other products

[ Products search ] [ favorites ] [ Tell friends ] [ Print ] [ Close ]